Design and Layout of all the buildings for the 2011 3 Aces Camp.

3Aces Project – Mining Camp Layout Design

3D Planning & Spatial Design for a Functional Remote Camp Environment.

A detailed 3D camp layout developed to support mining operations, integrating accommodation, infrastructure, and logistical flow into a cohesive and efficient site plan.

This project focuses on the conceptual design and 3D layout of a mining camp environment, created to support operational efficiency and livability in a remote setting. The plan brings together key elements such as housing, service areas, and access routes into a structured and functional design.
Design and Layout of all the buildings for the 2011 3 Aces Camp. The 3 Aces camp is operated by Golden Predator Mining Corp. located 160km north of Watson Lake In the Yukon Territories and is still in operation today though with more permanent structures.